Friday, 19 February 2016

Classic Standard Four Wheel Coach - Pt.2













The roof was checked for alignment before a securing screw was fitted to both ends. To do this a 2.5mm hole at each end was drilled through the end panels and counter sunk.

With the roof loosely fitted, a pencil mark was made through the end panels to the roof section. A pilot hole of 1.6mm was then made through the marked roof section at both ends.













The chassis needed trimming on all four edges using a Dremmel cutting disc and sander. The corners were rounded to assist the final fit.

The stiffening bars and axle holders were fitted in place with the glue allowed to set.













Next I decided to add some weight whilst improving the appearance of the floor section with the addition of 'coffee stirrers'.
Two sizes of floor boarding were used culminating in the centre of the floor. Each strip was fixed with supa-glue.

Once the flooring was fixed, it was sanded smooth. Later in the build process it will be varnished.

Part 1

Wednesday, 27 January 2016

Classic Standard Four Wheel Coach - Pt.1

Having admired these coaches for some time, I finally decided to buy a rake of these from Rob at Swift Sixteen. That's two of these, a Half Observation Coach and a Brake Coach plus all the fittings.

The two sides and ends were sanded on the inside with wet & dry, cleaned  and assembled using Supaglue.

Although there are groves and tabs to assist with the assembly, I would recommend the use of a set-square.
As each piece is detailed to a very high standard there is very little need to remove any moulding debris.
The next stage will be the chassis.











Part 2

Friday, 18 December 2015

Merry Christmas and A Happy New Year

I would like to take this opportunity to wish all visitors and friends and family alike, a Merry Christmas and a prosperous New Year for 2016.

Saturday, 24 October 2015

Gordon

Gordon is one of our regular visitors to HLR and is always turned out smart in regimental tie, jacket and cavalry twills.


Gordon is from the Modeltown range of Standing Figures (No. F202).

Tuesday, 20 October 2015

New Homestyal Halt station building

In preparation for a new platform and facilities at Homestyal Halt, a new building for the station has been built.


Purchased from Modeltown, the building is a relative easy model to make.

The building incorporates a seating area, Station Master and Ticket office.
Not included in the kit are the fascia boards, working lamp, signage and timetable.

The building was primed and painted with Humbrol acrylic paint and finished with a coat of matt varnish.

Friday, 16 October 2015

Brookwood and the early morning goods train.

Crossing Brookwood Bridge with the early morning delivery.
Just around the corner.
Pulling into sleepy Brookwood.
Strange passengers hanging around the station.
All's quiet at Brookwood.

Tuesday, 8 September 2015

W&LLR The Earl No.822


The Earl, No.822 departing Welshpool with her three Pickering coaches during the Steam Gala weekend, 6th September 2015.

Monday, 27 July 2015

Fairbourne & Barmouth Steam Railway

The railway runs from Fairbourne village to the mouth of the Mawddach estuary connecting with the ferry to Barmouth. Started as a 2 foot gauge horse drawn tramway it was reduced to a 15 inch gauge in 1916 and later in 1984 to 12.25 inch gauge.

Russell preparing for her first departure of the day at Fairbourne.
Penrhyn Point.
Yeo resting in the engine shed at Fairbourne.
Turntable to the engine shed at Fairbourne.
The Barmouth Ferry at Penrhyn Point.
Russell steaming up at Penrhyn Point ready for her return to Fairbourne.
Token exchange.

Tuesday, 21 July 2015

Florence's new coaches.


Slowly crossing "the door to nowhere" enroute to Buddleia Pond.
Proudly displaying her new coaches.
Steaming along.