Photo 7 |
With the first loop virtually complete, it was time to lay the foundations for the second loop (Photo 7).
Photo 8 |
As this was much higher at the front edge due to the slope of the land, a third layer of concrete bricks had to be laid (Photo 8).
Photo 9 |
Photo 10 |
No comments:
Post a Comment