Thursday, 21 July 2011

Billy Boiler - Stage 1

















After putting the completed chassis to one side, the boiler assembly was started.  Firstly the boiler's brass wrapper and smokebox has to be painted.

To prepare for this, all fittings were removed including the boiler, regulator and pressure gauge. (Kit HBK3 comes with these already loosely fitted.)

Next stage, the painting system.

1 comment: