Tuesday, 25 October 2011

Vale of Rheidol Railway

The 11.75 mile journey takes approximately one hour in each direction between Aberystwyth and Devil's Bridge but on this particular day, sadly no trains were seen running.  However I did manage to take some 'bits & pieces' shots of the railway. 
No.7 chassis belonging to engine 'Owain Glyndwr' awaits her wheels, boiler and body at Aberystwyth station. 
Rolling stock in various state of repair at Aberystwyth station. 
No.10 diesel outside Aberystwyth engine shed. 
The other end of the line at Devil's Bridge station. 
Devil's Bridge station. 
Looking westward along the line at Devil's Bridge station.

No comments:

Post a Comment