With the footings and supports in place, it was time for a quick alignment check. Everything was good, with both axis being perfectly level.
Although there is still plenty to do with regards to the modelling of the bridge, it was very pleasing to know that all was in order.
Diagonal struts, walk boards, painting and illumination have all still to be added.
Looking good!
ReplyDelete