Monday, 22 April 2013

Brookwood - The Foundations (Stage 1a)















With two and a half rows of blocks laid, the station foundations are almost complete. At the bottom of the photograph another three blocks will be laid at the end of row two for the line to continue to the Ash Pit, Repair Pit and the Maintenance Shed.















The five dwarf conifers will be relocated once the foundations for the Maintenance Shed have been laid. It will be at this point that the building work for the foundations will stop and recommence most probably during Spring 2014 when the foundations for the line to the Engine Shed will be laid.















Looking along the line from where the platform will be, towards Brookwood Bridge which can be seen in the distance.

No comments:

Post a Comment