Friday, 23 March 2012

Girder Bridge - Stage 2

With both sides completed,  six 250mm lengths of aluminium were cut with 8mm holes drilled at each end and then connected to both sides across the top.













Similar to the top, five 250mm lengths of angle-aluminium were cut, again with 8mm holes drilled at each end and then attached to both sides across the base.













Next stage, track supports and side diagonals, angle permitting.

No comments:

Post a Comment